The City Rail Link (CRL) is a 3.45 km twin-tunnel (twin bored and mined) underground rail link 42m below Auckland’s Central Business District that has been constructed to support the exponential growth of New Zealand’s largest city. The CRL enhances the Auckland rail network, allowing trains to run both ways through Britomart, the busiest station in New Zealand. This efficient and reliable transport investment will support economic development and significantly ease congestion in the central city. The rail network can more than double peak flows to 54,000 people an hour.

CRL will connect downtown at Waitematā Station (Britomart) with a re-developed Maungawhau station on the Western Line. Construction includes three new stations and links into the North Auckland Line. This includes two new underground stations (caverns), one 300 m long, 20 m deep top-down cut and cover station at Aotea, and the other comprising two 32 m deep top-down constructed shafts and mined excavation platform tunnels at Karanga-a-Hape. The project works include deep portals, tie-ins, and mechanical, electrical, fire, hydraulic, and rail systems.

Maungawhau (Mount Eden) Station will be the largest developed site in the CRL project and will have a distinctive impact on future development in the Mount Eden area. This package has included realignments, upgrades and extensions to the existing public realm and streetscape network around the new station.

CRL construction began in late 2018, with completion and handover due in mid-2025.

Services

  • An alternative underground route of the rail alignment via Albert Street ridge (a value engineering approach adopted by AT)
  • ECI phase technical advice
  • Assessment of potential settlement effects on surrounding structures along the entire CRL alignment
  • Geotechnical peer review of the main temporary and permanent civil retention and breakthrough works
  • Preliminary design of alternative solutions, monitoring requirements and input into the construction methodology for the enabling works during the tender design phase
  • Geotechnical advice and support during the ECI phase, including alternative retention designs and value engineering improvements
  • Additional geotechnical site investigations
  • Preparation of the Groundwater and Settlement Monitoring Contingency Plan
  • Planning services involving coordination and preparation of the construction management plans required as part of the resource consent
  • Spaceproofing and layout planning of the running tunnels and platforms for all utilities and rail systems
  • Full detail design of the underground civil works
  • Geotechnical structures for the NASL connections
  • Leading and coordinating the design development and detailed design of the package as well as the delivery of various interim and enabling works packages
  • Running Safety In Design, design coordination and consultation workshops
  • Designer responses to Road Safety Audits
  • Design reviews and reports
  • General coordination with interfacing packages
  • Signals design, signage, and markings design
  • Vehicle tracking assessments and street design
  • Planning and consenting advisory
  • Engineering Geology
  • Environmental management
  • Contaminated Land
  • Air quality

Clients

  • Auckland Transport
  • City Rail Link

Year

  • 2012 – current

Explore More Projects

Drury South Crossing Precinct

Drury South Crossing Precinct

Waterview Connection

Waterview Connection

Te Ara Tupua Shared Cycle and Walkway

Te Ara Tupua Shared Cycle and Walkway

Pukeahu War Memorial Park

Pukeahu War Memorial Park

previous arrow
next arrow

How can we help?

Get in touch with a Tonkin + Taylor representative today. Our friendly and knowledgeable team make it easy to find the right solution to suit your specific needs.

Get In Touch