In terms of its works and procurement method, the LEAD Housing Development Programme is a ‘first of its kind’, large-scale, brownfield land development programme being delivered under an alliance model. It is a longitudinal project (10 years) with staged delivery.

On behalf of Kāinga Ora, the LEAD Housing Development Programme streamlines land development and delivers new, upgraded infrastructure and amenities. Responsibilities include geotechnical investigation, surveying, civil design and infrastructure planning, removal of old state housing, land remediation, arranging consents for earthworks and infrastructure, civil construction including roads, parks and utilities, Construction Phase Support (CPS) and stakeholder engagement.

Tonkin + Taylor, as part of the LEAD Alliance, is undertaking design and construction work to regenerate a significant portion of brownfield land within the Auckland Isthmus. The scale of this project is substantial: 7,000 existing homes are to be removed (mostly demolished, some relocated) and replaced, and the creation of over 700 superlots to provide for approximately 34,500 dwellings over 590 hectares divided into multiple precincts and numerous neighbourhoods within each.

Our work includes preparing land for development and delivering new and upgraded infrastructure and amenities. With hazardous building materials, our scope covers pre-demolition asbestos surveys, clearance following asbestos removal of buildings and reviewing contractor documentation for licensed asbestos works.

We have also undertaken technical assessments and prepared construction noise and vibration management plans for these extensive works and ongoing noise and vibration monitoring for compliance and complaint investigations.

Services

  • Land remediation work
  • Hazardous building material surveys
  • Providing technical guidance for Kāinga Ora
  • Asbestos building surveys, removal works monitoring and clearance
  • Hazardous building materials surveys and construction observation, clearance, and removal
  • Construction noise and vibration management plans and monitoring

Awards

  • Finalist place in the prestigious regional Asia Pacific Spatial Excellence Awards 
  • Excellence in Environmental & Sustainability – IPWEA
  • Supreme Award for Asset Management – IPWEA

Client

  • Kāinga Ora

Year

  • 2018 – ongoing (completion due 2030)

Explore More Projects

Drury South Crossing Precinct

Drury South Crossing Precinct

Te Ara Tupua Shared Cycle and Walkway

Te Ara Tupua Shared Cycle and Walkway

previous arrow
next arrow

How can we help?

Get in touch with a Tonkin + Taylor representative today. Our friendly and knowledgeable team make it easy to find the right solution to suit your specific needs.

Get In Touch